A newer version of this dataset is available.

PM mass at Birkenes II

4 January 2017 - 6 January 2021

Product information

Variable(s) pm10_mass, pm10_pm25_mass, pm25_mass
Product type Observation
Instrument type(s)
  • Low Vol Sampler
Timeliness Scheduled
Start time 4 January 2017
Stop time 6 January 2021
Framework GAW-WDCA, EMEP_preliminary, NILU, EMEP
Instrument model(s)
  • Leckel/LVS3

Facility information

Facility name Birkenes II (NO0002R)
Facility type Observation platform, fixed
Coordinates 58.38853°N, 8.252°E
Altitude 219.0 m

File information

PID https://doi.org/10.48597/77PE-7AJX
Filename 77PE-7AJX.nc
Format(s) HDF5 (NetCDF4)
Filesize 147.0 kB
Version v2
Last modified 7 June 2026 18:30:37
Data Access
Metadata access

Provenance (to be completed)

Software ebas-io
Version history Concept DOI

Citation & acknowledgements

Licence CC BY 4.0
Citation string Yttri, K., Aas, W. GAW-WDCA, EMEP_preliminary, NILU, EMEP, 2017-2021, PM mass at Birkenes II, data hosted by EBAS at NILU, DOI: https://doi.org/10.48597/77PE-7AJX

Please include the following information in your publication. You may edit the text to suit publication standards.


Acknowledgements Data used in this <study/report/figure/etc.> were accessed from EBAS (https://ebas.nilu.no) hosted by NILU. Specifically, the use included data affiliated with the framework: GAW-WDCA, EMEP_preliminary, NILU, EMEP

Originator(s)

Karl Espen, Yttri Norwegian Institute for Air Research
Wenche, Aas Norwegian Institute for Air Research

Principal investigator(s)

Karl Espen, Yttri Norwegian Institute for Air Research
Wenche, Aas Norwegian Institute for Air Research