PM mass at Birkenes II

4 January 2017 - 7 January 2026

Product information

Variable(s) pm10_mass, pm25_mass, pm10_pm25_mass
Product type Observation
Instrument type(s)
  • Low Vol Sampler
Timeliness Scheduled
Start time 4 January 2017
Stop time 7 January 2026
Framework EMEP, ACTRIS, NILU
Instrument model(s)
  • Leckel/LVS3

Facility information

Facility name Birkenes II (NO0002R)
Facility type Observation platform, fixed
Coordinates 58.38853°N, 8.252°E
Altitude 219.0 m

File information

PID https://doi.org/10.48597/AR55-BT3F
Filename AR55-BT3F.nc
Format(s) HDF5 (NetCDF4)
Filesize 221.0 kB
Version v2
Last modified 22 May 2026 03:10:58
Data Access
Metadata access

Provenance (to be completed)

Software ebas-io
Version history Concept DOI

Citation & acknowledgements

Licence CC BY 4.0
Citation string Yttri, K., Aas, W. EMEP, ACTRIS, NILU, 2017-2026, PM mass at Birkenes II, data hosted by EBAS at NILU, DOI: https://doi.org/10.48597/AR55-BT3F

Please include the following information in your publication. You may edit the text to suit publication standards.


Acknowledgements Data used in this <study/report/figure/etc.> were accessed from EBAS (https://ebas.nilu.no) hosted by NILU. Specifically, the use included data affiliated with the framework: EMEP, ACTRIS, NILU

Originator(s)

Karl Espen, Yttri Norwegian Institute for Air Research
Wenche, Aas Norwegian Institute for Air Research

Principal investigator(s)

Karl Espen, Yttri Norwegian Institute for Air Research
Wenche, Aas Norwegian Institute for Air Research