A newer version of this dataset is available.

OC/EC at Zarra

2 January 2023 - 29 December 2023

Product information

Variable(s) elemental_carbon, organic_carbon
Product type Observation
Instrument type(s)
  • Low Vol Sampler
Timeliness Scheduled
Start time 2 January 2023
Stop time 29 December 2023
Framework EMEP
Instrument model(s)
  • MCV/CMV-1D-m

Facility information

Facility name Zarra (ES0012R)
Facility type Observation platform, fixed
Coordinates 39.08278°N, -1.10111°W
Altitude 885.0 m

File information

PID https://doi.org/10.48597/VCE8-VXYA
Filename VCE8-VXYA.nc
Format(s) HDF5 (NetCDF4)
Filesize 80.4 kB
Version v4
Last modified 3 September 2026 11:50:26
Data Access
Metadata access

Provenance (to be completed)

Software ebas-io
Version history Concept DOI

Citation & acknowledgements

Licence CC BY 4.0
Citation string Cervantes Rodriguez, J. EMEP, 2023-2023, OC/EC at Zarra, data hosted by EBAS at NILU, DOI: https://doi.org/10.48597/VCE8-VXYA

Please include the following information in your publication. You may edit the text to suit publication standards.


Acknowledgements Data used in this <study/report/figure/etc.> were accessed from EBAS (https://ebas.nilu.no) hosted by NILU. Specifically, the use included data affiliated with the framework: EMEP

Originator(s)

Jose Luis, Cervantes Rodriguez ES04L

Principal investigator(s)

Jose Luis, Cervantes Rodriguez ES04L