A newer version of this dataset is available.

Pm25_mass at Birkenes II

1 January 2014 - 6 January 2016

Product information

Variable(s) pm25_mass
Product type Observation
Instrument type(s)
  • Low Vol Sampler
Timeliness Scheduled
Start time 1 January 2014
Stop time 6 January 2016
Framework NILU_preliminary, EMEP, EMEP_preliminary, NILU
Instrument model(s)
  • Leckel/LVS3

Facility information

Facility name Birkenes II (NO0002R)
Facility type Observation platform, fixed
Coordinates 58.38853°N, 8.252°E
Altitude 219.0 m

File information

PID https://doi.org/10.48597/R4JP-HBF6
Filename R4JP-HBF6.nc
Format(s) HDF5 (NetCDF4)
Filesize 59.6 kB
Version v3
Last modified 28 May 2026 03:04:22
Data Access
Metadata access

Provenance (to be completed)

Software ebas-io
Version history Concept DOI

Citation & acknowledgements

Licence CC BY 4.0
Citation string Yttri, K. NILU_preliminary, EMEP, EMEP_preliminary, NILU, 2014-2016, Pm25_mass at Birkenes II, data hosted by EBAS at NILU, DOI: https://doi.org/10.48597/R4JP-HBF6

Please include the following information in your publication. You may edit the text to suit publication standards.


Acknowledgements Data used in this <study/report/figure/etc.> were accessed from EBAS (https://ebas.nilu.no) hosted by NILU. Specifically, the use included data affiliated with the framework: NILU_preliminary, EMEP, EMEP_preliminary, NILU

Originator(s)

Karl Espen, Yttri Norwegian Institute for Air Research

Principal investigator(s)

Karl Espen, Yttri Norwegian Institute for Air Research