This dataset has been deleted and is shown for historical traceability only.

Pm25_mass at Campisabalos

1 January 2022 - 1 January 2025

Product information

Variable(s) pm25_mass
Product type Observation
Instrument type(s)
  • High Vol Sampler
Timeliness Scheduled
Start time 1 January 2022
Stop time 1 January 2025
Framework EMEP
Instrument model(s)
  • MCV/CAV-A/mb

Facility information

Facility name Campisabalos (ES0009R)
Facility type Observation platform, fixed
Coordinates 41.27417°N, -3.1425°W
Altitude 1360.0 m

File information

PID https://doi.org/10.48597/DGR4-4ZUE
Filename DGR4-4ZUE.nc
Format(s) HDF5 (NetCDF4)
Filesize 84.7 kB
Version v4
Last modified 13 June 2026 00:51:20
Data Access
Metadata access

Provenance (to be completed)

Software ebas-io
Version history Concept DOI

Citation & acknowledgements

Licence CC BY 4.0
Citation string Fernandez Monistrol, J., Cervantes Rodriguez, J. EMEP, 2022-2025, Pm25_mass at Campisabalos, data hosted by EBAS at NILU, DOI: https://doi.org/10.48597/DGR4-4ZUE

Please include the following information in your publication. You may edit the text to suit publication standards.


Acknowledgements Data used in this <study/report/figure/etc.> were accessed from EBAS (https://ebas.nilu.no) hosted by NILU. Specifically, the use included data affiliated with the framework: EMEP

Originator(s)

Jose Antonio, Fernandez Monistrol ES04L
Jose Luis, Cervantes Rodriguez ES04L

Principal investigator(s)

Jose Antonio, Fernandez Monistrol ES04L
Jose Luis, Cervantes Rodriguez ES04L